Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20050625
Date de publication: 13 septembre 2006

Promoteur – Intermédiaire Financier

Zeljeznica Crne Gore a.d.
(Railways of Montenegro Ltd.)

Lieu

Description

The proposed project consists of the rehabilitation of railway infrastructure along the main trunk line connecting the Port of Bar and the capital Podgorica with Belgrade and Pan-European Corridor X, as well as the acquisition of selected items of rolling stock for maintenance and regional passenger services.

Objectifs

The transport sector is important to the Montenegrin economy, and the railways play a critical role, also given the insufficient road network and the mountainous terrain, in ensuring movements of freight, particularly bulk items such as ores, steel and agricultural products. Railways are also a key transport mode for the Adriatic Port of Bar. Improvements in the railway infrastructure will enable the railways to respond to the demand and fully perform this role. This will benefit the economy of Montenegro which still relies on certain industries to generate most of the added value and employment.

Commentaires

Railways

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 34 million.

Coût total (montant approximatif)

EUR 68 million.

Aspects environnementaux

The proposed project comprises the rehabilitation of existing infrastructure on the existing alignment. It would therefore neither fall under Annex I nor Annex II of the EU Directive, thus not requiring an EIA. Taking into account the review of documentation concerning the project, no significant environmental problems are foreseen and the operation should have a rather limited environmental impact.

Passation des marchés

The Promoter is aware of the Bank procedures regarding procurement. Procurement procedures will be checked for consistency with the Bank’s guidelines.

Statut

Signé - 30/09/2008

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Monténégro Transports