Date de publication: 7 décembre 2005
Promoteur – Intermédiaire Financier
Palestinian Energy and Natural Resources AuthorityLieu
Description
The project consists of the study, design, supply, erection, commissioning and operation of a number of schemes to improve the quality and reliability of supply, reduce technical and non-technical losses and accommodate fast growing electricity demand.
Objectifs
The project is expected to result in increased system reliability, a reduction in technical and commercial losses, increased access to electricity, reduced operating and maintenance costs and increased safety for staff and consumers. By helping to meet the growth in demand and re-establish security of supply, the project will contribute to economic regeneration.
Commentaires
Electricity.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 45 million.
Coût total (montant approximatif)
EUR 98 million.
Aspects environnementaux
The project is expected to comply with both national standards and international recommendations in the field of environment.
Passation des marchés
International procurement, in line with EIB guidelines.
Statut
Signé - 13/12/2005