Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20050392
Date de publication: 8 novembre 2005

Promoteur – Intermédiaire Financier

A group engaged in the exploration, production, refining and distribution of petroleum products, in the transport and supply of natural gas and in CHP development.

Lieu

Description

The project involves the construction and operation of a natural gas-fired industrial cogeneration plant consisting of two identical gas turbines/steam boiler units (each approximately 40 MWe electricity and 125 t/h steam) to meet the major part of steam demand of a refinery. Surplus electricity will be exported via a new 150 kV overhead line to the national HV-grid.

Objectifs

Replacement of existing heavy fuel-oil fired power and heat generators to raise the efficiency of the energy conversion, to increase electricity sales to the grid and achieve compliance with the Large Combustion Plant Directive by reducing emissions of SO2, NOx and particulates.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Estimated at up to 50% of the project cost.

Coût total (montant approximatif)

To be determined.

Aspects environnementaux

Due to its thermal capacity, the project falls under Annex II of the EIA Directive 85/337/EC. A full EIA has been carried out. The EIA concluded that no site of nature conservation importance (Natura 2000) will be concerned by the project. The project is in line with the European policy objectives of promoting cogeneration, improving the environment and supporting the management and rational use of energy.

Passation des marchés

Procurement procedures followed the requirements of the European Utilities Directive 93/38/EC and tender notices were published in the OJEU.

Statut

Signé - 4/12/2006

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Portugal Énergie