Date de publication: 8 mai 2006
Promoteur – Intermédiaire Financier
Oesterreichische Elektrizitätswirtschafts AG.Lieu
Description
The project consists of the construction and operation of a pumped storage power plant near Kaprun in the Austrian Alps. The plant will share the two existing hydro reservoirs built in the 1950s with the Kaprun 300 MW pumped storage scheme existing since then.
Objectifs
The project will contribute to the requirements for peak power as well as electricity balancing and regulation in the countries covered by the integrated European grid system of the UCTE. This contributes to the balancing of demand and supply and the stability of the grid systems and thus to the security of power supply and the management and rational use of energy in the EU.
Commentaires
Art 267 a) energy projects of common interest.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 180 million.
Coût total (montant approximatif)
EUR 365 million. Subject to confirmation/change during project appraisal.
Aspects environnementaux
Compliance with EU Directive 97/11/EC, amending 85/337/EEC, will be verified during appraisal and the status of any environmental studies and public consultations will be reviewed.
Passation des marchés
The promoter is required to respect national and European legislation applicable to public authorities procurement (Directive 2004/17/EC).
Statut
Signé - 20/03/2007