Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20040506
    Date de publication: 1 juin 2005

    Promoteur – Intermédiaire Financier

    Tennet Transmission System Operator BV
    Arnhem,
    The Netherlands

    Lieu

    Description

    Tennet will be gradually implementing from 2005 to 2012 a new 380 kV link to close a loop in the transmission grid in the western conurbation of the Netherlands.

    Objectifs

    The project constitutes a capacity investment to suppress HV transmission system bottlenecks and meeting growing demand for transmission, and to maintain a high level of quality and security of supply.

    Commentaires

    Electricity transmission.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 200 million.

    Coût total (montant approximatif)

    Promoter’s estimates vary from EUR 220 million to EUR 415 million subject to final project layout.

    Aspects environnementaux

    The project falls under Annex I of Directive 97/11/EC and thus shall require an EIA. The environmental permitting and consultation process, as well as the procedures to obtain rights-of-way and building permits and the studies that are performed for that purpose shall be verified during appraisal to ensure that the environmental impact assessment procedures are acceptable to the Bank. Confirmation will be required from the competent authority regarding the impact of the project on any sites of nature conservation.

    Passation des marchés

    The promoter will ensure that contracts for the implementation of the project shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18 or 2004/17/EEC) with parallel publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 19/10/2005

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pays-Bas Énergie