Date de publication: 10 août 2005
Promoteur – Intermédiaire Financier
Public Establishment of Electricity for Generation and Transmission (PEEGT)Lieu
Description
Construction and operation of a dual-fired Greenfield power generating plant of a base load Combined Cycle Gas Turbine unit of 750 MW.
Objectifs
The project aims at the cost-effective supply of electricity, both to cover the growth of demand and re-establish security of supply. The combined cycle gas turbine technology is expected to raise the average thermal efficiency of the system and thereby to contribute to lowering emissions of greenhouse gases and air polluants per unit of electricity generated.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 200 million
Coût total (montant approximatif)
Estimated at EUR 480 million
Aspects environnementaux
Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures applied as necessary.
Passation des marchés
International procurement, in line with EIB guidelines.
Statut
Signé - 25/11/2005
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).