Description
The project consists of the construction of the high-speed rail infrastructure between Cordoba and Malaga, both located in the Region of Andalucia (objective 1 area).
Objectifs
The project is a priority TEN and a key component of the Spanish high-speed rail network. The new line will connect with the existing high speed line from Seville to Madrid, and from there to Barcelona and France, thus providing interoperability with the European rail network.
Commentaires
Rail.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to 50% of the total project cost.
Coût total (montant approximatif)
Around EUR 2000 million.
Aspects environnementaux
Compliance with EU environmental directives and national laws shall be ensured.
Passation des marchés
Compliant with EU Directives.
Statut
Signé - 29/11/2005
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).