Date de publication: 26 juin 2003
Promoteur – Intermédiaire Financier
The State of the Netherlands through the Ministry of Transport, Public Works and Water ManagementLieu
Description
Upgrading of 13 km of an existing trunk road from single to dual two-lane carriageway and the maintenance of a total of 25 km of road for a period of 15 years.
Objectifs
To improve access of a number of municipalities in the northern Netherlands to both the Trans-European Network (TEN) and the provincial capital Leeuwarden.
Commentaires
Roads.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to a maximum of EUR 75 million
Coût total (montant approximatif)
EUR 160 million (provisional estimate)
Aspects environnementaux
A detailed assessment (Trajectnota/MER Rijksweg 31-Leeuwarden/Drachten) as part of an EIA has been made in line with Dutch law which follows EU legislation. Final approval was received in May 1998 (Tracébesluit Rijksweg 31-Leeuwarden/Drachten) by the Ministry of Transport, Public Works and Water Management. Negative impacts are limited whereas positive impacts are important.
Passation des marchés
To be done in compliance with the EU’s Works Directive (93/37/EEC as amended by 97/52/EC) as well as the Dutch Law.
Statut
Signé - 26/10/2004