Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20020138
    Date de publication: 17 juillet 2002

    Promoteur – Intermédiaire Financier

    Ministry of Education

    Lieu

    Description

    Construction and equipment of 337 new schools and refurbishment / extension of 1877 existing schools covering the entire public compulsory (primary and secondary) education estate in Jordan.

    Objectifs

    Increase the availability of adequate classrooms and enable a normal accommodation for an increased number of new students to improve the enrolment rates in the basic and secondary cycles. Enlarge the local qualified manpower and increase earnings expectations and living standards of the local population.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    About EUR 525 million

    Aspects environnementaux

    The environmental impact of the project is expected to be minor and linked to construction and changes in traffic movements.

    Passation des marchés

    The Ministry of Education will follow usual open public tender procedures in line with the Bank's procurement guidelines.

    Statut

    Signé - 17/07/2003

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Jordanie Éducation