Date de publication: 26 mars 2002
Promoteur – Intermédiaire Financier
Private owner and operator of 21 hospitals in Germany and Austria.Lieu
Description
The project comprises the construction of two new private acute hospitals (Müllheim and Schkeuditz) and the upgrading / refurbishing of additional four facilities, including medical equipment and information technology.
Objectifs
The project objective is to achieve economic solutions allowing cost savings in hospital operations by removing unfavourable building structures and configurations, with the result of improving the qualitative medical care in the hospitals' catchment area.
Commentaires
Hospital activities.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 50m
Coût total (montant approximatif)
Up to EUR 133.5m
Aspects environnementaux
Healthcare facilities do usually not generate significant environmental impact, however contaminated waste will be adequately treated. Although Directive 97/11/EC does not specifically mention hospitals, it could be relevant in case the new or rehabilitated hospital buildings were located in urban areas. It is unlikely that an EIA will be required but this will be verified during appraisal.
Passation des marchés
Procurement procedures applied by the promoter are in compliance with Council Directives applicable to public authorities procurement and national legislation.
Statut
Signé - 23/08/2004
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).