Date de publication: 15 juin 2004
Promoteur – Intermédiaire Financier
Serbia and Montenegro Air Traffic Services Agency, Limited (SMATSA, LTD.)Description
The project comprises the comprehensive rehabilitation and modernisation of the Air Traffic Control (ATC) infrastructure of Serbia and Montenegro, thus securing its conformity with ICAO standards and EUROCONTROL plans for coordinating and integrating Central and Eastern European air traffic control services.
Objectifs
The project will restore the level of safety and efficienty required by a unified European ATC network.
Commentaires
Air transport.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 36m.
Coût total (montant approximatif)
Approximately EUR 100m.
Aspects environnementaux
The project is expected to have a negligible effect on the environment. All project elements will be installed in built up areas or are replacing already existing equipment and buildings.
Passation des marchés
EIB procedures for international procurement will be applied, where applicable.
Statut
Signé - 10/06/2005
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).