Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
400 000 000 €
Pays
Secteur(s)
Pologne : 400 000 000 €
Transports : 400 000 000 €
Date(s) de signature
26/11/2024 : 400 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
15 avril 2024
Statut
Référence
Signé | 26/11/2024
20230987
Nom du projet
Promoteur – Intermédiaire financier
S19 EXPRESSWAY MIEDZYRZEC PODLASKI - LUBLIN
MINISTRY OF INFRASTRUCTURE / GDDKIA - REPUBLIC OF POLAND
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 400 million
EUR 979 million
Lieu
Secteur(s)
Description
Objectifs

The loan will finance the construction of a new 2x2 lanes S19 expressway between Bialystok and Lublin on a 101 km long section between the S19 interchange with A2 motorway and Lublin. The project follows up the recently completed S19 expressway section between Lublin and Rzeszow, co-financed by the Bank. Works include new construction and extension of the existing infrastructure. The project design foresees construction of approximately 87 km of a 2x2 lane expressway, partially along the existing alignment of National road DK19 and partially along a new alignment, and a second two lane driveway (approximately 14 km) on the two existing bypass sections. The project scope also includes the construction of grade separated interchanges, animal crossings, drainage systems, noise protection screens, local and service roads and passenger service areas.

The project is located north of Lublin in Lublin voivodeship (Lubelskie) on a north - south road corridor between Bialystok and the Polish - Slovakia border via Rzeszow. The corridor is running along the eastern border of Poland with Belarus and Ukraine and therefore is strategically important in the context of the ongoing war in Ukraine. The project will contribute to improved accessibility in the eastern Poland region by adapting of the technical and operational parameters of the road to the forecast traffic level, removing bottlenecks and completing the missing segments of the entire S19 expressway. This will improve international and local traffic flow organization and driving conditions on the corridor, which is particularly important for Ukraine transit traffic. It will also contribute to improved traffic safety and living conditions for inhabitants alongside the existing National Road DK19.

Additionality and Impact

The project concerns construction of a new 101km long 2x2 lanes S19 expressway section between the interchange with A2 motorway and Lublin. The project contributes to improved efficiency of the TEN-T road network in Poland, thereby improving accessibility and market integration. The project is expected to contribute to the reduction of safety related negative externalities, by diverting heavy and transit traffic from the agglomerations crossed by the national and local roads. The project will contribute to better accessibility in the region by adapting of the technical and operational parameters of the road to the forecast traffic level, removing bottlenecks and completing missing elements of the road infrastructure.

The EIB impacts investment activity by providing financial support that is complementary to national financing.

The terms of the EIB loan, notably in terms of long tenor (up to 30 years), appropriate disbursement conditions and advantageous financial terms will contribute substantially to increasing the financial flexibility and investment capacity of the Promoter, facilitating the completion of the project on favourable terms and in a timely manner.

Aspects environnementaux
Passation des marchés

The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU and is therefore subject to an EIA procedure. As on most of the Polish road infrastructure projects, this is a two-stage process. Five Environmental Decisions have been issued based on the initial EIA studies, while six second stage supplemental EIA (SEIA) studies, one for each works contract, were completed for different sections in order to apply for a construction permit (ZRID). According to the preliminary analysis, the project alignment does not directly intersect any NATURA 2000 sites but runs nearby some of them. Appraisal will also address the identification of potential climate change risks and the analysis of the suitability of adaptation measures for ensuring the long-term resilience of the new road. The scope and adequacy of these measures, as well as the overall impact of the project implementation on the GHG emissions will be further assessed during the appraisal.

Procurement is completed. Tenders were launched in 2020 and 2021 and six "design and build" type of works contracts were signed in 2021 and 2022. The completion of the project is planned by the end of 2027. The EIB will verify that contracts for implementation of the project are tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
25 juin 2024
26 novembre 2024
Lien vers la source
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - S19 EXPRESSWAY MIEDZYRZEC PODLASKI - LUBLIN
Date de publication
6 Jul 2024
Langue
Sujet général
Prêts
Numéro du document
185697808
Thématique du document
Information Environnementale
Numéro du projet
20230987
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes