Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
100 000 000 €
Pays
Secteur(s)
Italie : 100 000 000 €
Industrie : 100 000 000 €
Date(s) de signature
28/06/2024 : 100 000 000 €
Lien vers la source
Autres liens

Fiche récapitulative

Date de publication
1 juillet 2024
Statut
Référence
Signé | 28/06/2024
20230748
Nom du projet
Promoteur – Intermédiaire financier
SNAM CLIMATE ACTION FL II
SNAM SPA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 100 million
EUR 134 million
Lieu
Secteur(s)
Description
Objectifs

The framework loan will support a pipeline of small to medium sized energy efficiency projects, mainly in public buildings and industry, to be implemented by SNAM group in Italy.

Through the renovation and energy performance guarantee of residential, healthcare, educational public and private buildings and renewable energy investments, aims to improve energy efficiency, the project will reduce carbon emissions and EU dependency from fossil fuels, decrease environmental impact and air pollution, deliver health benefits through improved air quality and positive social impact through job creation.

Additionality and Impact

As this operation focuses on energy efficiency ("EE") and buildings integrated renewables, the underlying investments will support the EU's and Bank's priority in the energy sector (energy efficiency and renewable energy) and the EIB's climate action objectives, as the whole operation (100%) will contribute to climate change mitigation objectives.

The implementation of the EE schemes financed under this operation will contribute to the achievement of Italy's 2021-2030 "National Energy Climate Plan" that envisages ambitious targets of carbon emissions' abatement. In turn, it supports the EU and national targets for EE and contributes to the security of energy supply and environmental objectives. The operation is fully aligned with the "EU Energy Performance of Building Directive - EU/2010/2031" as amended in 2018 and with the "Energy Efficiency Directive", as well as the "Green Deal Renovation Wave" and "REPowerEU".

In addition, the operation supports the Bank's mandate to the EU's regional policy as part of the schemes are expected to be in less developed regions (approximately 22%).

The operation meets an existing demand for energy efficient investments in Italy. The operation contributes to reduce the market failures linked to asymmetric information and principal/agent problem. As there is a chronic underinvestment in EE for buildings, the operation demonstrates how to scale up and industrialize this sector through aggregators such as energy service companies ("ESCOs") and utilities, complementing EIB's additionality to national EE incentives.

The Promoter is deemed to be capable of implementing the operation considering its overall experience. The operation is expected to be both financially and economically viable, with excellent economic rate of return ("ERR") and positive social broader benefit.

The EIB support to this operation provides the Promoter with a substantial financial value added as well as higher flexibility compared to available market alternatives. The EIB financial value added is even more tangible under the ongoing market instability and turmoil generated by current geopolitical situation.


Aspects environnementaux
Passation des marchés

The project is in line with the EIB's priority lending objectives for energy efficiency (EE) as for the Green Deal Renovation Wave and renewable energy (RE) as for REPowerEU and supports the Climate Action objective (100%). Given the scale, location and nature of the renovation sub-projects in built-up urban areas an environmental impact assessment (EIA), as defined under the EIA Directive 2014/52/EU, amending the 2011/92/EU, is normally not required. Some of the projects may fall under Annex II of the Directive Environmental Impact Assessment (EIA) Directive 2011/92/EU (amended by 2014/52/EU). In those cases, the competent authority needs to screen the projects and determine whether an Environmental Impact Assessment (EIA) is required or not. The project will be appraised and monitored in line with the EIB's policies, including the Environmental and Social Sustainability Framework.

The sub-projects involving public buildings will fall under public procurement. The promoter has to ensure that contracts for the implementation of the projects are tendered in accordance with the relevant applicable EU procurement legislation.

Milestone
À l'examen
Approuvé
Signé
26 juin 2024
28 juin 2024
Projets associés
Lien vers la source
Fiche récapitulative
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes