Signature(s)
Montant
100 000 000 €
Pays
Secteur(s)
Espagne
: 100 000 000 €
Transports
: 100 000 000 €
Date(s) de signature
26/02/2010 : 100 000 000 €
Lien vers la source
Fiche technique
Autres liens
Fiche récapitulative
Date de publication
27 juillet 2009
Statut
Référence
Signé | 26/02/2010
20080536
Nom du projet
Promoteur – Intermédiaire financier
FEVE V
Ferrocarriles de Via Estrecha (FEVE).
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
Up to EUR 100 million.
The cost estimate provided by the promoter at this stage is approximately EUR 220 million.
Lieu
Secteur(s)
Description
Objectifs
The project consists of rehabilitation, upgrading, and electrification of FEVE’s railway infrastructure between Infiesto – Cabezón and Orejo – Aranguren.
The project will contribute to the objective of promoting sustainable transport, as increased rail usage with a shift from road to rail would reduce levels of emissions and road accidents.
Aspects environnementaux
Passation des marchés
The project’s compliance with all applicable EU environmental legislation will be verified during appraisal.
The Bank will require the promoter to ensure that the contracts related to the project have been or shall be tendered in accordance with EU public procurement procedures.