Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20060014
Date de publication: 14 mars 2006

Promoteur – Intermédiaire Financier

AEM Torino SpA.

Lieu

Description

The project comprises:

  • a further phase of upgrading of the promoter's existing Combined Heat and Power (CHP) electricity generating plant by re-powering with a gas turbine (from 140 MWe to 390 MWe) for Combined Cycle Gas Turbine (CCGT) operation;
  • the installation of digital remote metering infrastructure.

Objectifs

Investments are aimed at:

  • improving the efficiency of electricity production with combined-cycle electricity production with heat output feeding an existing district heating network, and;
  • a better management of electricity demand through the installation of remotely-controlled electricity metering equipment allowing time-of-day tariffs to be offered and the potential for reducing peak demand levels.

Commentaires

Combined heat and electricity generation and distribution.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 100 million.

Coût total (montant approximatif)

Total project cost is expected to be some EUR 240 million.

Aspects environnementaux

The CCGT falls under Annex I of the Directive 97/11/EC and requires an Environmental Impact Assessment (EIA), which was carried out in 2000 by assessing the impact of all phases of replacement and re-powering of units at this site. The competent authorities granted permits based on this EIA in 2002 (environmental) and 2003 (operation). Investments for remote metering infrastructure principally involve the substitution of existing equipment and the use of a telecommunication network on power lines. Any adverse environmental impact of this component is thus expected to be minimal.

Passation des marchés

Tenders Electronic Daily (TED OJEU) lists among other publications made by the promoter two notices of “the existence of a qualification system” published under the Utilities Directive (93/38/EC) covering the relevant services and supplies for both project elements. Further, the promoter carries out formal international tendering for various types of other works and equipment following the relevant national legislation including publication in the OJEU and on its website, when appropriate.

Statut

Signé - 15/12/2006

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Énergie