Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
50 000 000 €
Pays
Secteur(s)
Roumanie : 50 000 000 €
Énergie : 50 000 000 €
Date(s) de signature
1/07/2025 : 50 000 000 €

Fiche récapitulative

Date de publication
29 avril 2025
Statut
Référence
Signé | 01/07/2025
20240933
Nom du projet
Promoteur – Intermédiaire financier
ELECTRICA GREEN BOND FRAMEWORK (GBPP)
SOCIETATEA ENERGETICA ELECTRICA SA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 75 million
EUR 329 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The project concerns the purchase by the EIB of Green Bond instruments issued by Electrica under its Green Financing Framework. The proceeds resulting from the operation will finance new eligible projects in Romania, compliant with the EIB 's Climate Action and Environmental Sustainability (CAES) framework and eligibility criteria.

The aim is to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, and pollution prevention and control. The operation is in line with Article 309 point (a) projects for developing less-developed regions and point (c) common interest of the Treaty on the functioning of the European Union.

Additionality and Impact

The green bonds will finance investments in electricity distribution, production of electricity from renewable sources as well as electricity storage. Through the issuance, the company will improve its electricity distribution network, build up a portfolio of renewable electricity projects, and pave the way for future green bond issuances, this being the first for a Romanian corporate. The project will contribute towards the decarbonisation targets set out in the Romanian National Energy and Climate Plan, as well as the REPower EU Action Plan.


The EIB intervention is justified by the presence of certain market failures that may result in sub-optimal investment. The Project will enable the Promoter to meet the increase in demand and the requests for new connections while maintaining or improving the reliability and quality of the distribution network They also contribute to the integration of additional renewable generation, which results in lower carbon and air pollution externalities. Investments contribute to maintaining security of supply, a public good.


The project falls under the EIB's Climate Action and Environmental Sustainability (CAES) Framework and it is expected to be fully implemented in EU cohesion regions. The operation's overall economic justification is deemed Very Good, with a Very Good broader social benefit. The Promoter is an experienced utility and is capable of implementing and operating the underlying assets.


The EIB is expected to be a cornerstone investor in this first corporate green bond issuance in Romania, by providing a strong signalling effect to other investors. At project origination and preparation, EIB support was key to the structuring of the operation to align it fully with policy objectives (CAES, EU Taxonomy alignment).


Aspects environnementaux
Passation des marchés

Some schemes covered by the operation may be subject to an Environmental Impact Assessment (EIA). These schemes will fall under Annex I or II of the EIA-Directive 2011/92/EU as amended by Directive 2014/52/EU, requiring either an EIA including public consultation, or screening by the national competent authority on the basis of Annex III of the same Directive, to determine the need for an EIA. The promoter will need to comply with sustainability-related disclosure requirements under national and EU legislation, which is applicable to its activities, e.g. publication of EIAs. If EIAs of the underlying schemes are not published by the competent authorities, the promoter will need to ensure the EIAs are made public, to ensure compliance with the Bank's Transparency Policy. In any case, the promoter will need to keep the EIAs on file and ensure that the environmental permit requirements are adequately implemented. Environmental and social due diligence will focus on the capacity of the promoter to identify, assess, manage and monitor environmental, climate and social effects, and to ensure that underlying schemes comply with national and EU legislation, as applicable, and with EIB Environmental and Social Standards (ESS) and relevant guidelines. This due diligence will be based on public and non-public information.

The Bank will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
25 juin 2025
1 juillet 2025

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - ELECTRICA GREEN BOND FRAMEWORK (GBPP)
Date de publication
1 Jul 2025
Langue
Sujet général
Prêts
Numéro du document
247274525
Thématique du document
Information Environnementale
Numéro du projet
20240933
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Autres liens

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes