Date de publication
27 janvier 2026
Statut
Référence
À l'examen | 03/04/2025
20240915
Nom du projet
Promoteur – Intermédiaire financier
AKTOR REPOWEREU FRAMEWORK LOAN
AKTOR SA HOLDING COMPANY TECHNICAL AND ENERGY PROJECTS
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 80 million
EUR 200 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The project will finance renewable energy and battery energy storage projects in Greece.

The operation aims to finance part of the promoter's pipeline of wind, solar, and battery storage projects. It will contribute to achieving the 2030 decarbonisation targets set out in Greece’s National Energy and Climate Plan (NECP) and is therefore eligible under Article 309, point (c) — common interest. Most of the underlying projects are expected to be located in Less Developed Regions, making them also eligible under Article 309, point (a). The underlying projects are expected to be economically viable, generating clean and renewable electricity at a levelised cost of energy below that of fossil-fuel alternatives in Greece.

Aspects environnementaux
Passation des marchés

Due to their technical characteristics, most of the individual schemes and most of the ancillary infrastructure are expected to fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU (apart from the battery energy storage systems which do not fall under any of the annexes of the Directive), requiring the competent authorities to determine whether an EIA is required. New overhead transmission lines for the interconnection of the schemes to the grid, if part of the project and if falling under Annex I due to their technical characteristics, will be expected to be subject in all cases to an EIA process. Some of the schemes in the preliminary project portfolio have already undergone an EIA process and obtained positive environmental decision. The Bank will assess the capacity and capability of the promoter to implement the schemes in line with EIB Environmental and Social Standards and requirements. For large allocations, the authorization procedure and compliance with the relevant EU directives, specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), will be further assessed during the appraisal of the individual scheme, in particular the potential cumulative impacts assessment and the impacts on protected flora and fauna, including Natura 2000 sites. Given that China largely dominates the market of photovoltaic solar panels, and media reports about the risk of forced labour, the Bank will apply for PV schemes an enhanced due diligence on the topic, in line with the EIB's Environmental & Social Standards. The project is expected to contribute to Climate Action and Environmental Sustainability objectives, in particular to climate change mitigation and pollution prevention and control.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the promoter to apply those rules.

Milestone
À l'examen
Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes