Fiche récapitulative
- Transports - Transports et entreposage
The project will finance the reconstruction of the existing track and the construction of the second track on the section Križevci - Koprivnica to the state border with Hungary to be implemented by HZ Infrastruktura (HZI). This large scheme represents an allocation under the EIB operation "Railway Development Framework Loan Croatia 2022-0660", signed in 2024.
The revitalisation of the existing railway infrastructure will improve national railway resilience and contribute to enhance connectivity of people and/or goods.
Where and if applicable, and based on a risk-based approach as defined in the EIB Group's environmental and social policy, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU), Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal.
The promoter shall ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.