Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
125 000 000 €
Pays
Secteur(s)
Italie : 118 750 000 €
Transports : 125 000 000 €
Date(s) de signature
18/06/2025 : 6 250 000 €
18/06/2025 : 118 750 000 €
Lien vers la source

Fiche récapitulative

Date de publication
26 juin 2025
Statut
Référence
Signé | 18/06/2025
20230628
Nom du projet
Promoteur – Intermédiaire financier
FERROVIE DELLO STATO GREEN BOND FRAMEWORK (GBPP)
FERROVIE DELLO STATO ITALIANE SPA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 300 million
EUR 600 million
Lieu
Secteur(s)
Description
Objectifs

The project involves the subscription of Green Bonds to co-finance eligible investments in sustainable mobility, as promoted by Ferrovie dello Stato Italiane under its Green Bond Framework.

The objective is to enhance the quality, availability, and reliability of rail services in Italy, leading to savings in time and vehicle operating costs, a reduction in infrastructure maintenance expenses, and an improvement in railway safety. The project aims to promote a modal shift from road to rail, providing environmental and road safety benefits while contributing to the advancement of sustainable transport in alignment with EU objectives. The proceeds under the green bond framework focus on electric railway infrastructure and rolling stock, therefore they are in line with the criteria for substantial contribution to tackle Climate Mitigation under the EU Taxonomy. Consequently, the project supports Climate Action and Environmental Sustainability (CA&ES) objectives outlined in the Climate Bank Roadmap. Some project components are expected to be located along lines within the Trans-European Network (TEN-T), while others will be located in less developed or transition regions, thereby supporting cohesion objectives.

Additionality and Impact

The operation consists of the purchase of green bonds under a public issuance by Ferrovie dello Stato Italiane SpA (FS). According to the Green Bond Framework published by the Promoter, these bonds will primarily finance investments in electric rolling stock for both passenger and freight transport, as well as existing or new electrified railway infrastructure (in particular related to the completion of the Italian High-Speed network).

The components financed under this operation will increase quality, availability and reliability of rail services in Italy or other EU countries. The financed components are expected to generate time and vehicle operating cost savings, reduce maintenance costs of the infrastructure and improve railway safety. The underlying Projects are expected to contribute to modal shift from road to rail and, thereby, present environmental and road safety benefits as well as contribute to the development of sustainable transport in line with EU objectives.

The operation is part of the innovative Green Bond Purchase Programme approved in 2022 and aimed at investing into public green bonds. The active role of the Bank in the green bond market - either as issuer either as investor - is expected to provide a meaningful contribution to several European policy goals, such as the development of the Capital Market Union and European regulatory standards, including Corporate Sustainability Reporting Directive and the EU Green Bond Standard.

The EIB involvement as anchor investor is expected to broaden the investors' base, reduce the price volatility on secondary market and provide a positive signalling effect to green bond market participants.

Aspects environnementaux
Passation des marchés

The project will have a positive environmental impact by supporting railways in maintaining and enhancing their modal share in crucial areas of the passenger and freight market that are best suited for rail transport. All projects financed with the bond proceeds will comply with the criteria of the EIB's Climate Action and/or CA&ES objectives.

The promoter shall ensure that contracts for the project implementation have been tendered in accordance with the applicable EU procurement legislation, Directives 2014/23/EU, 2014/24/EU, 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Commentaires

In line with similar operations targeting the purchase of Green Bonds, the pipeline of eligible investments is not known at the moment of appraisal. Total Project Costs is a preliminary estimate of the Bank of the potential pipeline of future eligible projects that the Promoter is expected to allocate under the future Green Bond issuances

Milestone
À l'examen
Approuvé
Signé
3 juin 2025
18 juin 2025
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - FERROVIE DELLO STATO GREEN BOND FRAMEWORK (GBPP)
Date de publication
1 Jul 2025
Langue
Sujet général
Prêts
Numéro du document
197163469
Thématique du document
Information Environnementale
Numéro du projet
20230628
Secteur(s)
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes