    Referenz: 20160412
    Veröffentlichungsdatum: 24 Juli 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    CAMARA MUNICIPAL DE LISBOA

    Ort

    Beschreibung

    Upgrade the drainage network of Lisbon, including drainage tunnels and ancillary infrastructure to reduce the frequency and magnitude of floods in the city.

    Ziele

    Lisbon has been suffering from intense and more frequent flood events in the past years. These events not only negatively affect the tourism industry, but more importantly, cause long lasting detrimental effects to the city population, as well as to its property and heritage. The project is intended to minimize the recurring and increasing problem of flooding while increasing infrastructure resilience in specific vulnerable areas of the City of Lisbon, including parts of the historical city centre. The project is part of the Lisbon's Drainage Master Plan 2016-2030, which includes recommendations regarding a number of structural interventions in the city.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 65 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 134 million

    Umweltaspekte

    The project will deliver substantial environmental quality improvements, notably in the form of increased resilience against damages from high intensity floods. Some project components fall under Annex II of the Environmental Impact Assessment EIA Directive 2011/92/EU, which has been transposed into Portugal's legislation (Decreto Lei n.º 151-B/2013.) The competent authority, namely the Portuguese Environment Agency (APA), has issued the approvals for the Titulo Unico Ambiental (TUA) and the Declaracao de Impacto Ambiental (DIA).

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/24/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Genehmigt - 18/09/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).