Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20160398
    Veröffentlichungsdatum: 25 Juli 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    AQUAFIN NV

    Ort

    Beschreibung

    The project comprises schemes for the construction of collector sewers, storm overflows and small and medium-sized wastewater treatment plants, plus some upgrading of existing wastewater treatment plants for tertiary treatment in the Flemish region. Implementation of the sub-projects is planned for 2017-2020.

    Ziele

    The project will improve and expand the existing infrastructure for wastewater collection and treatment. The works included in the project aim at cost-efficient solutions to comply with the mandatory environmental requirements.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 454 million

    Umweltaspekte

    The Flemish region has been meeting the requirements of the Urban Wastewater Directive since 2012. The operation will support the region to keep this compliance as well as to improve the quality of wastewater services provided. Aquafin has a good environmental awareness and has developed operating procedures to optimise the performance and cost-effectiveness of its systems. So far, it has demonstrated in the previous operations with the Bank that it fully complies with the Environmental Impact Assessment, Birds and Habitats Directives.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC and Dir 2007/66/EC) with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 13/02/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Belgien Wasser, Abwasser