    Referenz: 20150526
    Veröffentlichungsdatum: 25 Juli 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    ELECTRICITE DE FRANCE, INTERNATIONAL FINANCE CORP, REPUBLIQUE DU CAMEROUN

    Ort

    Beschreibung

    The project consists of the development, construction and operation of the 420MW Nachtigal dam and hydroelectric power plant, to be located on the central course of the Sanaga river, 65 km northeast of Yaoundé.

    Ziele

    The project will provide much-needed economically advantageous renewable electricity supply to the population and businesses of Cameroon.

    Kommentar(e)

    This project represents a coherent development of the hydrological resource of the Sanaga river as a result of the recent construction of the Lom Pangar regulating dam project, whose objective was to help unlock the hydro potential of the Sanaga river, by providing a more stable flow of water during dry periods.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 50 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1260 million

    Umweltaspekte

    If located within the EU, the project would fall under Annex I of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) requiring an EIA. An environmental and social impact assessment (ESIA) (2006, 2011) has been produced for the entire project in alignment with national legislation and IFC performance standards, including public consultation. The Bank will assess the environmental and social aspects of the project to ensure that they are acceptable for Bank financing.

    Auftragsvergabe

    The Bank will assess that procurement of the components to be financed by the Bank has been undertaken in a manner which is acceptable for Bank financing.

    Projektstatus

    Unterzeichnet - 8/11/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).