Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20150124
    Veröffentlichungsdatum: 26 Januar 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    Project implementation unit within the Municipality of Yerevan

    Ort

    Beschreibung

    The project involves the rehabilitation of municipal buildings in Yerevan, the capital city of Armenia. The loan amount is expected to be phased in two or three finance contracts.

    Ziele

    The main objective of this project is to increase the energy efficiency of municipal buildings, which will have a significant impact on CO2 emission reduction and thus contribute to climate change mitigation. Besides this, energy efficiency investments will generate local and regional economic activity, particularly in the construction industry, and therefore support the development of the private sector and small and medium-sized enterprises (SMEs).

    Sektor(en)

    Garantie im Rahmen des Außenmandats

    This operation is covered by the ELM Guarantee.

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 12 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 15 million

    Umweltaspekte

    This operation intends to bring environmental benefits by supporting i) projects that reduce energy consumption in public buildings and ii) projects with other small specific energy efficiency measures, having a short payback, thus helping to mitigate climate change as well as improving seismic safety and accessibility for disabled people. The individual schemes to be financed are likely to be small and are expected to have a very limited negative environmental impact, if any at all. Given the scale, location and nature of the schemes in built-up urban areas, environmental impact assessment (EIA), as defined in the EIA Directive 2011/92/EU, should normally not be required. Compliance with the Bank's environmental and social standards will be further assessed during appraisal.

    Auftragsvergabe

    The Bank will require the municipality of Yerevan to ensure that implementation of the project is done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 1/12/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Armenien Dienstleistungen