Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20140105
    Veröffentlichungsdatum: 29 August 2014

    Projektträger – zwischengeschaltetes Finanzinstitut

    PUBLIC ENTITY(IES)

    Ort

    Beschreibung

    The water and wastewater component will primarily support improvements in water supply, metering and wastewater networks. The solid waste management part of the project comprises construction of sanitary landfills and closure of the existing dumpsites, as well as supply of waste collection equipment for the local municipal companies.

    Ziele

    The project addresses the most urgent needs in solid waste management amid financial constraints. The project will provide sanitary landfills serving over 600,000 inhabitants that will reduce adverse environmental, health and climate impacts from current dumpsites that will be closed and eventually rehabilitated. It is also expected to improve operational efficiency of municipal solid waste collection.
    The water supply component is expected to increase service level in terms of reliability of water systems and quality of drinking water in the service area. In some cities, projects will include also a wastewater component that is expected to contribute to the improvement of public health and reliability of the system.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 20 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 80 million

    Umweltaspekte

    The project is expected to bring an overall positive impact on environment and public health by providing access to better quality drinking water and by collection and treatment of wastewater. The solid waste component is intended to replace the dumpsites with sanitary landfills and thereby limit, to the extent possible, the adverse impact of disposal activities on environment, health and climate. Compliance of the individual projects with applicable national EIA legislation will be verified during the appraisal and allocation.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 28/05/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Kirgisistan Wasser, Abwasser Müllbeseitigung