Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    824.781.076,89 €
    Länder
    Sektor(en)
    Polen : 824.781.076,89 €
    Energie : 824.781.076,89 €
    Unterzeichnungsdatum
    6/11/2024 : 206.929.850,76 €
    19/12/2024 : 211.764.705,84 €
    17/03/2025 : 406.086.520,29 €

    Übersicht

    Veröffentlichungsdatum
    8 November 2024
    Projektstatus
    Referenz
    Unterzeichnet | 06/11/2024
    20230040
    Projekttitel
    Projektträger – Finanzintermediär
    NORTHERN POLAND ELECTRICITY GRID - REPOWEREU
    ENERGA SA
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    PLN 3500 million (EUR 810 million)
    PLN 5922 million (EUR 1371 million)
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project consists in an investment programme of Energa SA electricity distribution network in Poland over the period 2023-2025. The programme includes investments in network rehabilitation and expansion, and metering.

    The aim is to increase the distribution network capacity, maintain or increase its reliability, safety and security, renew existing assets and planned development (including renewable energy sources) as well as deploy smart technologies.

    Zusätzlichkeit und Wirkung

    The Programme supports the modernization, reinforcement and digitalisation of the electricity distribution network infrastructure in northern and central Poland, consistently with the country's National Energy and Climate Plan and in alignment with EIB policies. All of the programme schemes are located in Cohesion Priority Regions. The programme is expected to deliver economic benefits over the financial return, in particular by addressing market failures linked to negative environmental externalities (reducing GHG emissions from power generation by connecting renewables and, indirectly, from mobility) and the supply of public goods (security of power supply) and has positive ESG impacts.

     

    The Programme contributes to Bank's lending priority objectives on Climate Action and Environmental Sustainability and it aligns with the REPowerEU objectives. The financing of the programme will contribute to the Bank's ELP themes on Securing the Enabling Infrastructure (energy networks) and Innovative technologies and new types of energy infrastructure (smart meters).

     

    In line with the EU Taxonomy, electricity grid infrastructure in Europe is considered eligible for classification as an activity contributing to climate change mitigation.

     

    The project is expected to deliver good economic benefits and good broader social benefits. The promoter is experienced in works of this nature and has a sound project management system in place.


    The Promoter appreciates the financial value added provided by the EIB. The long tenor of the EIB loan (18) is well in line with the economic life of the underlying electricity distribution assets (>25 years) and it is perfectly suited to finance investments with long payback period such as the Project implemented by ORLEN. The funding of similar maturities is not available on the Polish bond or loan market. Customised terms such as flexible drawdown over the long availability period are of value to the Promoter because of the multiannual Project's implementation period. The EIB involvement should have a crowding-in effect and send a strong signalling effect to commercial banks operating in Poland, EBRD and other stakeholders that EIB is standing by to support the decarbonisation of the Polish energy sector.


    Umweltaspekte
    Auftragsvergabe

    Some programme schemes may fall under Annex II of Directive 2014/52/EU, amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for environmental and biodiversity impact and appropriate assessments.

    The promoter has to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Phase
    In Prüfung
    Genehmigt
    Unterzeichnet
    20 Juni 2024
    6 November 2024

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - NORTHERN POLAND ELECTRICITY GRID - REPOWEREU
    Datum der Veröffentlichung
    22 Jun 2024
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    178493428
    Thema
    Umweltinformationen
    Projektnummer
    20230040
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen