Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
120 000 000 €
Pays
Secteur(s)
Autriche : 120 000 000 €
Transports : 120 000 000 €
Date(s) de signature
26/08/2025 : 120 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
16 octobre 2024
Statut
Référence
Signé | 26/08/2025
20230681
Nom du projet
Promoteur – Intermédiaire financier
OEBB SERVICEJET RETTUNGSZUEGE
OEBB-INFRASTRUKTUR AG
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 120 million
EUR 267 million
Lieu
Secteur(s)
Description
Objectifs

The project will finance the acquisition of 18 high-tech-hybrid service jets trains for fire extinguishing and rescue, serving in maintenance, train rescue and firefighting roles. The new trains will have three propulsion systems, such as electric, battery only and diesel (emergency-use only).

By replacing the existing, obsolete and age expired fleet, the project will enable the Austrian railway network to continue delivery essential maintenance and safety services with improved operational efficiency, reliability and effectiveness.

Additionality and Impact

The project fleet will support safe, sustainable, resource efficient and reliable operations of the Austrian railway network, in particular for the large number of tunnels. The project fleet's main purpose is to offer emergency services for fires in tunnels and on other parts of the network. The project fleet will also support the maintenance of the overall railway network by offering safe and fast access and egress for maintenance personnel to tunnel infrastructure.


The provision of reliable emergency services and support for maintenance operations contribute towards a safe, available and cost effective railway infrastructure. This will further contribute to more competitive and more available railway services in passenger and freight markets. The use of railway services over other modes with higher externalities and costs to society contributes to traffic and environmental objectives.

The assets necessary for railway operations have long life and the benefits from these assets materialise over long time. The (national) financial markets often do not offer loan tenors that match the life of the assets. EIB is well positioned to offer the relevant lending terms for a project with long asset life and several years of construction period.

The Project is consistent with the Bank's Transport Lending Policy and contributes to meeting the Bank's commitment to climate action and environmental sustainability.


The EIB supports the diversification of the funding for this highly specialized asset and facilitates a solid financier base for this first-time borrower. The Bank offers the Borrower an opportunity of competitive long-term financing, matching the very long economic life of the underlying asset. This will lower the cost of operation for railway safety services, making railways a more competitive mode of transport than it would have been, had the original fleet been used further.

The flexible tranching of the EIB loan balances favourably the complementary flows from private financing partners. The long availability period allows the borrower to match the delivery plan and grants valuable flexibility in case of delays for this very specialized vehicle.

Aspects environnementaux
Passation des marchés

Purchase of rolling stock does not require an Environmental Impact Assessment (EIA). The project aligns with the objectives of the Paris Agreement in accordance with the criteria set out in the EIB Climate Bank Roadmap. It consists of acquisition of zero direct emission mobile assets, which bring demonstrable environmental and safety improvements to the OEBB fleet.

The promoter has completed a competitive tender and awarded the contract for the manufacturing of the project fleet to Swiss manufacturer Stadler.

Commentaires

The total project investment cost includes in addition to 18 trains also requisite spare parts, provisions for contingencies and interest during construction.

Milestone
À l'examen
Approuvé
Signé
9 janvier 2025
26 août 2025
Lien vers la source
Fiche récapitulative
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - OEBB SERVICEJET RETTUNGSZUEGE
Date de publication
11 Jan 2025
Langue
Sujet général
Prêts
Numéro du document
210848565
Thématique du document
Information Environnementale
Numéro du projet
20230681
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Autres liens

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes