Lien vers la source
Fiche technique
Autres liens
Fiche récapitulative
Date de publication
24 juillet 2006
Statut
Référence
Signé | 14/12/2006
20050588
Nom du projet
Promoteur – Intermédiaire financier
EDP Ambiente
EDP - Energias de Portugal, S.A.
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 180 million, indicatively.
EUR 370 million, indicatively.
Description
Objectifs
Studies, design, construction and commissioning of a flue gas abatement system (SO2, NOx and particulates) as a retrofit of three existing coal-fired power stations, one located near Sines in southern Portugal (4 units 314 MWe each); and two located in Spain (Soto Ribera III (350 MWe), Aboño II (556 MWe).
To enable the promoter to comply with the tighter emission limits under EU (Directive 2001/80/EC) and National legislation.
Aspects environnementaux
Passation des marchés
Compliance with EU environmental directives and national laws will be ensured.
The project has been advertised in the Official Journal of the EU in accordance with relevant EU procurement legislation (Directive 93/38/EEC).
Commentaires
Power generation.