Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170697
    Date de publication: 15 décembre 2017

    Promoteur – Intermédiaire Financier

    REPUBLIKA SRPSKA

    Lieu

    Description

    Construction of flood protection facilities along the Sava river and its tributaries

    Objectifs

    This project is consistent with Pre-Accession support and support for EU External Policies in the Neighbourhood/Partnership Countries. It is eligible under the External Lending Mandate (ELM) Pre-Accession 2014 - 2020. The medium- to long-term measures, including flood risk mapping and management studies, both within the framework of the International Sava River Basin Commission, correspond to the requirements of the Flood Directive (2007/60/EC) within the EU. As such, the measures also contribute to the alignment with the EU acquis.

    Commentaires

    The project is expected to contribute to the objectives of the Building Block 1 of the Bank's Economic Resilience Initiative, aimed at supporting additional investments for vital infrastructures.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 19 million

    Coût total (montant approximatif)

    EUR 41 million

    Aspects environnementaux

    The measures will help to increase the country's resilience to the potential effects of climate change. Securing of public flood protection infrastructure is expected to have a substantial positive environmental and social impact, as well as an economic impact on the local economy through avoidance of future damages and losses.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 20/12/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bosnie-et-Herzégovine Eau, assainissement