Date de publication: 19 mai 2014
Promoteur – Intermédiaire Financier
The project promoter is the Slovak National Highway Company: Narodna dialnicna spolocnost, a.s. (NDS). NDS is the responsible authority for the development of motorways and expressways in Slovakia. The company is fully owned and managed by the Ministry of Transport, Construction and Regional Development. NDS staff administered the works contracts. Supervision services for the project were untaken by NDS. Construction works are completed.Lieu
Description
The project consists of the construction of a new 14.2 km section of the R4 Expressway between Kosice and Milhost in Slovakia.
Objectifs
The R4 expressway is located in eastern Slovakia and when complete will, together with a section of the D1 motorway, provide a north-south road corridor connecting Poland and Hungary.
Commentaires
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 45 million
Coût total (montant approximatif)
EUR 91 million
Aspects environnementaux
The project was included in the Operational Transport Programme 2007-2013 for Slovakia, which falls within the scope of the strategic environmental assessment Directive 2001/42/EC. The project is a class of development that is included under Annex I of the environmental impact assessment Directive 2011/92/EU and subject to full procedure. The project passes through a special protected area defined under the Birds Directive 2009/147/EC. Environment and nature conservation decisions have been issued by the national competent authorities.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where required.
Statut
Approuvé - 25/07/2014
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).