    Référence: 20130566
    Date de publication: 26 septembre 2014

    Promoteur – Intermédiaire Financier

    LILONGWE WATER BOARD

    Lieu

    Description

    Medium-term investment programme to optimise available water resources, bridging the gap in water demand in Malawi's fast-growing capital city. The project's main components consist of upgrading a dam that is Lilongwe's primary water source, extending water-treatment works, reducing leakages and improving network management.

    Objectifs

    The objective of the project is to ensure adequate water availability for the population of Lilongwe until 2022 and beyond whilst a new long-term water supply dam is being constructed. Current water supply in Lilongwe is 62 000 m3/day, which is lower than the current demand of 78 000 m3/day and, therefore, water rationing has been imposed since 2012. The supply deficit is expected to worsen further with Lilongwe's population growing at over 4% per year.

    Commentaires

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 29 million

    Coût total (montant approximatif)

    EUR 105 million

    Aspects environnementaux

    Investment components are largely confined to replacement of existing pipes and extension of water-treatment facilities. Therefore the operation is unlikely to result in any significant negative social or environmental impact. The exception is the proposed raising of the existing Kamuzu Dam I by approximately five metres, which requires a comprehensive environmental impact assessment.

    Passation des marchés

    The Bank will require the promoter to ensure that the implementation of the project is done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 12/06/2015

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Malawi Eau, assainissement