Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Übersicht

Veröffentlichungsdatum
19 März 2025
Referenz
20230541
Projekttitel
HOWOGE AFFORDABLE HOUSING BERLIN I
Ort
Sektor(en)
Beschreibung
Ziele

The investment loan to finance the new construction of energy efficiency affordable housing for rent to low and moderate-income households in Berlin.

The aim is to provide low and medium income households with affordable housing in the city of Berlin. The schemes under the project comprise the new construction of social and affordable rental housing, kindergartens, student accommodations and photovoltaic plants as renewable energy sources.

Additionality and Impact

The Project is in line with the objective of Social Investments, as per Annex II of the InvestEU Regulation.  It supports the implementation of the European Pillar of Social Rights.


The Project involves the new construction of energy efficiency affordable housing in Berlin. The Project is expected to increase the supply of new housing units in response to high demand for affordable housing in Berlin for the benefit of low- and moderate-income households. It contributes to improvements in the built environment and to urban regeneration making neighbourhoods more sustainable. The Project is expected to provide high quality and energy efficient buildings, which will lead to lower energy bills for low and moderate-income households. At policy level, the Project supports the EU Treaty, numerous Public Policy Goals and EIB Mandate Objectives.


The loan plays a crucial role in supporting the Borrower's extensive housing investment programme and establishing a stable long-term funding foundation. The Bank will provide an unsecured loan, which will be effectively subordinated to the Borrower's standard mortgage loans and will thus help to optimise its asset encumbrance levels with a view towards mobilizing traditional mortgage funding for its ambitious investment programme. Also, it will enable Howoge to access long-term funds over an extended period matching the project implementation period and the long-term nature of these investments.


The Project would not have been carried out (to the same extent) by the EIB without the InvestEU support.

Umweltaspekte
Auftragsvergabe

Compliance with the relevant EU Directives will be required throughout the Project's implementation: EU Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by 2014/52/EU, EU Strategic Environmental Assessment Directive (SEA) Directive 2001/42/EC, EU Habitats Directive92/43/EEC and EU Birds Directive 2009/147/EC. The status of any environmental studies and public consultations as well as the alignment of energy efficiency requirements with the EU Directive on the Energy Performance of Buildings 2010/31/EU will also be required.

The promoter shall ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Link zum projekt

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen