Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Unterzeichnung(en)

Betrag
34.147.756,34 €
Länder
Sektor(en)
Rumänien : 34.147.756,34 €
Energie : 34.147.756,34 €
Unterzeichnungsdatum
26/01/2026 : 8.198.664,2 €
26/01/2026 : 25.949.092,14 €

Übersicht

Veröffentlichungsdatum
26 Juni 2025
Projektstatus
Referenz
Unterzeichnet | 26/01/2026
20250095
Projekttitel
Projektträger – Finanzintermediär
DOBRUN & SADOVA SOLAR
SCATEC ASA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 34 million
EUR 121 million
Ort
Sektor(en)
Beschreibung
Ziele

The project consists of the development, construction and operation of a portfolio of 3 solar PV plants with a total capacity of ca. 190 MW, located in southern Romania, in the Olt and Dolj counties.

The aim is to contribute towards both national and EU energy and decarbonisation objectives. The project aligns with the EIB's lending policy on social cohesion, renewable energy and climate action. Its revenues will rely on a contract for differences (CfD) and sales on the wholesale market. Consequently, the project contributes to support the market integration of renewable energy projects. Situated in a Cohesion Priority Region, the project will contribute to support less-developed regions.

Additionality and Impact

The project increases renewable energy generation capacity in Romania and contributes to the 2030 targets set out in the National Energy and Climate Plan of Romania and the REPowerEU Action Plan.

The financing of this project also contributes to Bank's lending priority objectives on Sustainable Energy and Natural Resources (Renewable Energy), as well as the transversal objectives on Climate Action (Mitigation), Environmental Sustainability (Pollution Prevention Control) and Social and Economic Cohesion.


As the project will produce electricity from low carbon sources, it will address the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation).


The project is expected to rely on a public Contract for Difference (CfD) with exposure to residual market risks; thereby the project improves market efficiency and competition.


In terms of project results, the projects are expected to have an excellent rated economic rate of return, considering the economic value of the electricity generated. Market prices do not fully reflect the full economic cost and benefits of electricity generation and the negative environmental externalities in particular. Therefore, the project is expected to generate a positive broader social benefit by generating clean and renewable power at a cost (LCOE) reasonably below the cost alternatives in Romania.


EIB's funding will enable the Promoter to enhance the financing by accessing non-recourse long-term financing at terms that are tailored to the project's particular implementation period, revenue streams and cost profile. EIB's involvement is a positive signal to co-lending financial institutions and should provide substantial financial value added to the sponsors.

Umweltaspekte
Auftragsvergabe

The individual plants and the ancillary infrastructure fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU (amended by the Directive 2014/52/EU), requiring the competent authorities to determine whether an EIA is required. According to the promoter, all plants and ancillary infrastructure were screened-out for EIA. The EIB will review the EIA screening process during appraisal. Impacts on the environment from PV plants are likely to stem from noise, dust and increased traffic during the construction phase and to visual and land use impacts during operation. During the project appraisal, the EIB will assess compliance with the applicable EU Directives, in particular concerning cumulative impacts and potential impacts on nature conservation sites, as well as the promoter's capacity and capability to implement the project to comply with the applicable EU Directives.

The promoter has been assessed by the EIB as being a private entity and the PV plants will likely be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC and subsequent 2014/25/EU, hence private sector procurement procedures are expected to apply. However, if during project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the promoter will have to apply those rules.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
13 August 2025
26 Januar 2026

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - DOBRUN & SADOVA SOLAR
Datum der Veröffentlichung
23 Aug 2025
Sprache
Bereich
Finanzierung
Nummer des Dokuments
247819999
Thema
Umweltinformationen
Projektnummer
20250095
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen
Andere Links

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen