Veröffentlichungsdatum: 27 Mai 2025
Projektträger – zwischengeschaltetes Finanzinstitut
SLOVAK REPUBLICOrt
Beschreibung
The operation will finance the construction of new premises and the upgrade of the J.A. Reiman hospital in Presov (Eastern Slovakia) elevating it to the highest standards for a dual-use military and civilian university hospital. In detail, the project involves the extension of the existing campus with a new hospital building to consolidate the acute medical services in one integrated building with about 183 000 m2 GFA (Gross Floor Area). The new building will provide space for about 932 standard beds (which, in case of need, can be extended and reprofiled to up to 1,236 emergency beds), 17 operation theatres and an extensive area for diagnostics and treatment with about 3 linear accelerators, 5 CTs, 3 MRIs and 6 conventional x-ray facilities.
Ziele
The aim is to enhance the conditions for patient treatment and medical staff training while significantly improving the hospital's environmental sustainability, thereby reducing CO2 emissions and dependency on fossil fuels in the future.
Sektor(en)
- Gesundheit - Gesundheits- und Sozialwesen
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 300 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 600 million
Umweltaspekte
Hospitals are not explicitly mentioned in the environmental impact assessment (EIA) Directive 2011/92/EU (as amended by 2014/52/EU), though the project is covered by Annex II of the Directive concerning urban development. The compliance with requirements of the EIA Directive 2011/92/EU, as amended by 2014/52/EU on EIA and Habitats Directive, will be verified during appraisal. It is expected that the project will bring comprehensive benefits to the community, as healthcare is an element of social cohesion and economic development.
Auftragsvergabe
The promoter shall ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Projektstatus
In Prüfung - 16/04/2025
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).