    Referenz: 20240425
    Veröffentlichungsdatum: 25 Juli 2024

    Projektträger – zwischengeschaltetes Finanzinstitut

    TAGENERGY SA

    Ort

    Beschreibung

    The project concerns the development, construction and management of a 240MW / 480MWh Battery Energy Storage System (BESS) in Cernay-lès-Reims, Marne, France.

    Ziele

    The aim is to realise a utility scale BESS to provide additional flexibility resources and system services (frequency containment and restauration, balancing, and additional capacity for adequacy needs) to the French and European power systems. The project will enable the integration of renewables and will contribute to secure the system supply.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    not disclosed

    Gesamtkosten (voraussichtlicher Betrag)

    not disclosed

    Umweltaspekte

    The project includes components that may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC). No major environmental or social impacts are expected for the envisaged project (including batteries systems and associated infrastructures).

    Auftragsvergabe

    The promoter has been preliminarily assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. In any case, the promoter has to ensure that the project will be implemented in accordance with the EIB's Guide to Procurement.

    Projektstatus

    In Prüfung - 27/06/2024

    Milestone
    In Prüfung

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).