Referenz: 20220666
Veröffentlichungsdatum: 21 November 2025

Projektträger – zwischengeschaltetes Finanzinstitut

SCATEC ASA

Ort

Beschreibung

The project entails the development, implementation and operation of a 100 MW electrolysis plant in Egypt for the production of hydrogen. The produced hydrogen will be used in an ammonia production plant in Ain Sokhna.

Ziele

The aim is to produce Renewable Fuel of Non-Biological Orgin (RFNBO) for the European market and in accordance with EU requirements. In addition, the project intends to decarbonise ammonia production in Egypt by utilising renewable hydrogen as a feedstock instead of grey hydrogen, supporting Egypt's Nationally Determined Contributions (NDC) commitments. The project also intends to contribute to Egypt's National Low Carbon Hydrogen Strategy, which aims to position Egypt as a global renewable hydrogen hub. The project is in line with the EU-Egypt Strategic and Comprehensive Partnership and the priorities outlined in the Multi-annual cooperation program (2021-2027) between EU and Egypt.

Sektor(en)

  • Industrie - Verarbeitendes Gewerbe/Herstellung von Waren

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

not disclosed

Gesamtkosten (voraussichtlicher Betrag)

not disclosed

Umweltaspekte

The related impacts will have to be assessed by the relevant environmental studies for compatibility with the EIB's environmental and social standards. The local authority has already issued the environmental permit for the electrolyser.

Auftragsvergabe

The promoter shall ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The project seems to be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC and 2014/25/EU, hence private sector procurement procedures will apply.

Projektstatus

Genehmigt - 10/12/2025

Milestone
In Prüfung
Genehmigt
10 Dezember 2025

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).