Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20210765
    Veröffentlichungsdatum: 26 Juni 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    STATE OF ISRAEL - MINISTRY OF FINANCE

    Ort

    Beschreibung

    The project will finance the design, construction and operation of a sea-water desalination facility, with production capabilities of 100 million m3 per annum to be located in Western Galilee, Israel.

    Additionality and Impact

    The project concerns the construction of a seawater reverse osmosis desalination plant under a Build Operate and Transfer contract in Israel. The project is a high priority water supply infrastructure aimed at ensuring access to water in one of the world's most water stressed region. The project will contribute to meeting the Bank's policy objectives of Sustainable Energy and Natural Resources as well as Climate Action and Environmental Sustainability. The project will address a number of market failures through positive externalities notably from public health benefits, the protection and replenishment of over drafted groundwaters and an increased resilience to extreme weather events. By providing sustainable and reliable access to water in Israel, the project is aligned with the Strategic Priorities of the European Neighbourhood Instrument (ENI) and the latest EU/Israel Action Plan, which aim, among others, at promoting cooperation between Israel and the EU in reducing water pollution, protecting water resources and increasing the re-use of water.


    In terms of financial contribution, the EIB is expected to offer attractive and customised financing terms, which will increase the sustainability and ultimately lower the water desalination cost. The EIB loan contributes to the diversification of borrower's funding in terms of maturity profile, financier base as well as to the optimisation of the capital structure.

    Ziele

    The project iaims to ensure access to water, with significant climate change adaptation and mitigation impact, to address persistent droughts and increased demand for water in the country.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 150 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 470 million

    Umweltaspekte

    A combined environmental impact assessment for the proposed Western Galilee desalination plant has already been carried out by the promoter. The EIB shall ensure that it complies with the EIB's Environmental and Social standards and safeguards.

    Auftragsvergabe

    The project is procured under a public-private partnership (PPP) contract that includes a concession to build and maintain the facility for 25 years. The promoter has to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The borrower of the proposed EIB loan is the PPP winning bidder.

    Projektstatus

    Unterzeichnet - 23/12/2023

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    15 Juni 2022
    23 Dezember 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Israel Wasser, Abwasser