    Referenz: 20210737
    Veröffentlichungsdatum: 30 Mai 2022

    Projektträger – zwischengeschaltetes Finanzinstitut

    ELEKTROENERGIEN SISTEMEN OPERATOR EAD

    Ort

    Beschreibung

    An investment loan to co-finance, alongside the Recovery and Resilience Facility (RRF), a multi-scheme investment programme for the digital transformation, rehabilitation and upgrade of Bulgaria's electricity transmission network from 2022 to 2026.

    Ziele

    The programme is expected to improve the planning, operation, monitoring, control, maintenance and protection functions of the transmission network, increase its capacity, improve its flexibility, reliability, safety and security, and enable the integration of increasing amounts of renewable energy sources.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 118 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 332 million

    Umweltaspekte

    Some schemes fall under Annex II of Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected for these schemes relate to visual impact, impact on flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC).

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required

    Projektstatus

    In Prüfung - 10/05/2022

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Bulgarien Energie