    Referenz: 20200842
    Veröffentlichungsdatum: 11 Januar 2021

    Projektträger – zwischengeschaltetes Finanzinstitut

    SOFIA MUNICIPALITY

    Ort

    Beschreibung

    A major project allocation under the Bulgaria EU funds co-financing 2014-2020 loan consisting of the construction and commissioning of a new combined heat and power (CHP) plant for Sofia's district heating network operated by Toplofikacia utilising refuse-derived fuel (RDF). This would be the final phase of the integrated Sofia Municipal Waste project.

    Ziele

    The plant will combust refuse-derived fuel (RDF), feed its electricity into the public grid, and provide heat to the district heating system of Sofia. It will partly replace heat generation in existing natural gas fired installations.

    Kommentar(e)

    The same underlying project has already been supported by the Bank with Sofia Municipality as borrower under the operation TOPLOFIKACIA CHP PROJECT (2009-0545). Project investment costs have been allocated between the two operations in proportion to the proposed EIB financing.

    Sektor(en)

    • Müllbeseitigung - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 14 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 35 million

    Umweltaspekte

    The project is permitted. It falls under Annex I of the Environmental Impact Assessment (EIA) Directive (2011/92/EC at the time of permitting) and consequently required a mandatory EIA. It falls also under the provisions of the Industrial Emission Directive 2010/75/EC requiring, among others, use of best available technique.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and Directive 2007/66/EC), with publication of tender notices in the Official Journal of the EU, as and where appropriate.

    Projektstatus

    Genehmigt - 20/07/2021

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Bulgarien Müllbeseitigung