Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20190849
    Veröffentlichungsdatum: 19 März 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    UTTAR PRADESH METRO RAIL CORPORATION LTD

    Ort

    Beschreibung

    The project concerns is the construction and operation of an urban metro rail transit system in Kanpur, the largest industrial city of Uttar Pradesh. EIB will finance the acquisition of rolling stock and the development of two metro rail corridors with elevated sections, totaling to 32.4 km with 31 stations (of which 19.4 km with 19 stations and 13 km with 12 underground stations).

    Ziele

    The new metro will contribute to make Kanpur safer and more business-friendly. By facilitating access to amenities and jobs, this low carbon and climate resilient urban infrastructure will improve the conditions for private sector development, while reducing environmental impact. The project contributes to the two main objectives of the EIB External Mandate: (i) climate change mitigation, by promoting modal shift from road to rail while reducing greenhouse gas emissions, and (ii) social and economic infrastructure development, by contributing to urban development. The project is in line with the EU Country Strategy Paper for India which highlights the infrastructure gap and need to address rising greenhouse gas emissions.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 650 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1354 million

    Umweltaspekte

    In India, metro projects do not fall within the scope of the relevant Environmental Impact Assessment (EIA) legislation unless the built up area is beyond a defined threshold, in which case the project is subject to screening by the State level Competent Authority. The status of screening, if any, is to be determined during appraisal. The project has in any case been subject to an environmental and social impact assessment. The further steps in assessing and managing environmental risks are to be reviewed during appraisal. Compliance with relevant EIB Social Standards is to be reviewed.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 31/08/2020

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Indien Verkehr