Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20190298
    Veröffentlichungsdatum: 18 Dezember 2019

    Projektträger – zwischengeschaltetes Finanzinstitut

    KANTELEEN VOIMA OY

    Ort

    Beschreibung

    The project will finance (i) the upgrade of the condensing power plant to a Combined heat and power (CHP) plant (ii) a greenfield advanced bioethanol plant (iii) a greenfield biogas plant and (iv) ancillary equipment.

    Ziele

    The CHP plant aims at co-combusting fossil and renewable feedstocks during a transition period. The fossil feedstock shall be progressively phased out. The whole project is in line with the principles and goals of the Renewable Energy Directive (RED) II 2018/2001/EU, supporting the production of advanced biofuels from forest residues and sawmill by-products (RED, Annex IX, part A).

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 95 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 316 million

    Umweltaspekte

    Compliance with the environmental legislation (notably the Environmental Impact Assessemnt (EIA) directive 2014/52/EU amending the EIA Directive 2011/92/EU) will be assessed during appraisal, as well as well compliance with the Industrial Emissions Directive (IED) directive 2010/75/EU.  The EIA for the new complex (bioethanol & biogas production) was performed in 2017. The environmental permit approval should be received in early 2020.  Concerning the upgrade of the power plant from electricity only to a CHP, the EIB will ensure that the project is aligned with the EIB new threshold for GHG emissions, as well as with the RED 2018/2001/EU.

    Auftragsvergabe

    Based on the information provided, the promoter has been identified as a privately owned entity operating in the utility sector, that has not been granted special or exclusive rights and does not operate in markets which are not liberalised. The procurement regime will be assessed during appraisal.

    Projektstatus

    In Prüfung - 11/11/2019

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Finnland Energie