Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20180081
    Veröffentlichungsdatum: 1 Oktober 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    MINISTRY OF TRANSPORT, COMMUNICATIONS AND WORKS - REPUBLIC OF CYPRUS

    Ort

    Beschreibung

    The project consists of the construction and improvement of roads and motorways implemented by the Public Works Department of the Ministry of Transport, Communication and Works in the Republic of Cyprus.

    Ziele

    The project aims to improve traffic conditions on several sections of the Cyprus motorway and road network. Transport user benefits are expected from time savings, reduced operating costs, fewer accidents and lower environmental externalities, in addition to wider economic benefits from improved accessibility.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 220 million

    Umweltaspekte

    The projects included under this operation fall under Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU). Compliance with the EIA Directive in addition to the Strategic Environmental Assessment (SEA) Directive (2001/42/EC) and Birds and Habitats Directives (2009/147/EC and 92/43/EEC respectively, as amended) is to be assessed during the appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Projektstatus

    In Prüfung - 24/05/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Zypern Verkehr