Suche starten De menü ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20170964
    Veröffentlichungsdatum: 14 November 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    SPECIAL PURPOSE ENTITY(IES)/FUND

    Ort

    Beschreibung

    The project concerns the construction, installation, commissioning and operation of a transmission system based on several submarine fibre optic cable segments to link French Guiana with Brazil and Europe.

    Ziele

    The project will provide an infrastructure, which will strengthen the capacity and availability of telecom services across the region and particularly the ultra and very high speed fixed broadband services. Accordingly, the project is in line with the Europe 2020 Strategy to foster smart growth and develop an economy based on knowledge and innovation.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 15 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 40 million

    Umweltaspekte

    Investments in telecommunications projects and particularly submarine cables do not fall under Annex I or II of the Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU. Submarine cable projects have limited, localised and short-term environmental effects. The Bank will require the preparation of an Environmental and Social Impact Assessment (ESIA) to ensure that appropriate mitigation measures are adopted. The project is expected to have a positive social impact with better communications enhancing businesses, tourism, education and employment opportunities.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU or 2014/24/EU as applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Genehmigt - 11/12/2018

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Frankreich Telekommunikation