Suche starten De menü ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20170958
    Veröffentlichungsdatum: 10 Oktober 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    FUNDACION UNIVERSITARIA SAN ANTONIO

    Ort

    Beschreibung

    The project contributes to the 2019-2023 investment plan of Universidad Católica de Murcia (UCAM). The project includes the expansion of the existing campus in Murcia (Cohesion Region) as well as the construction of a new campus in Málaga (Cohesion region) and Madrid.

    Ziele

    The investments include the construction and restructuring of several buildings in Murcia (1st phase of the project), integrating the latest energy efficiency technologies: (i) a gymnasium (ii) an incubator for start-ups (iii) a building for classrooms (iv) a building for student residences (v) the library (vi) the restoration of a part of the central Monastery building In Madrid and Malaga the investments involve the construction of new university campus (2nd phase of the project), either through new construction or renovation of existing buildings.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 32 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 67 million

    Umweltaspekte

    The Directive 2011/92/EU amended by 2014/52/EU does not specifically mention the need for an Environmental Impact Assessment (EIA) for buildings relating to education, but it may be that some sub-projects can be regarded as urban renewal projects (Annex II of the European Directive). If required by the competent authority, the Promoter shall make the Environmental Impact Study/Statement (EIS) available to the EIB. Various sub-projects will incorporate very high standards of energy efficiency, environmental protection and sustainable development.

    Auftragsvergabe

    A Public Procurement regime will be followed under this project benefiting from EIB financing, where the promoter will be subject to EU public procurement legislation 2014/24/EC. The Bank requires the promoter to ensure that contracts for the implementation of the project have been / will be tendered in accordance with the relevant applicable EU procurement legislation 2014/24/EU, where applicable, as well or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Genehmigt - 15/10/2019

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Spanien Bildung