    Referenz: 20170479
    Veröffentlichungsdatum: 29 August 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    SUND OG BAELT HOLDING A/S

    Ort

    Beschreibung

    The project consists of the upgrading of the Danish railway access line, between Ringsted and Rodby, linking to the future Fehmarnbelt tunnel between Denmark and Germany.

    Ziele

    The project concerns improving the railway line connection to the Fehmarnbelt tunnel on the Danish side. The upgrade includes the increase of line speed to 200 km/h for passenger trains, electrification of the track, constructing a double track for the whole section and equipping the track with European Rail Traffic Management System (ERTMS) Level 2 baseline 3. The project is located on the Scandinavian - Mediterranean Trans-European Transport Core Network (TEN-T) Corridor.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 677 million

    Umweltaspekte

    The project consists of the modernisation and electrification of existing railway infrastructure and is to be carried out mainly within existing rights of way or on new alignment of twin track. The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and is a subject to an EIA.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been or shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EC) interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 5/03/2019

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Dänemark Verkehr