Veröffentlichungsdatum: 8 Januar 2018
Projektträger – zwischengeschaltetes Finanzinstitut
GRENOBLE-ALPES METROPOLEOrt
Beschreibung
The project supports different investment programmes of the Metropolitan Grenoble-Alpes to finance climate action related projects, mainly in the water and wastewater, mobility and energy sectors.
Ziele
The projects are expected to have significant climate change mitigation and adaptation contributions.
Sektor(en)
- Energie - Energieversorgung
- Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen
- Verkehr - Verkehr und Lagerei
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 100 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 237 million
Umweltaspekte
The various investments will bring positive environmental impacts and substantial climate change mitigation and adaptation actions. The projects include flood protection measures, drainage, water supply and wastewater collections network rehabilitation, renewal of public buses, vehicle fleets and tramways, expansion of cycling lanes and construction of a biomass fired boiler for district heating. The EIB will assess arrangements for the scrapping of old rolling stock or dismissed buses. Compliance with the EU Water Framework Directive (2000/60/EC), Drinking Water Directive (98/83/EC), Directive 2007/60/EC on the assessment and management of flood risks, Energy Efficiency Directive (2012/27/EU), Industrial Emissions Directive (2010/75/EU), public passenger transport services by rail and by road directive ((EC) No 1370/2007) and EU and national environmental legislation will be verified during appraisal.
Auftragsvergabe
The Bank will require the promoter to ensure that contracts for the implementation of the projects have been and will be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/23/EU, 2014/24/EU and 2014/25/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.
Projektstatus
Unterzeichnet - 29/06/2018
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).