Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20170425
    Veröffentlichungsdatum: 12 Oktober 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    WOJEWODZTWO MAZOWIECKIE

    Ort

    Beschreibung

    The proposed framework loan will part-finance the priority schemes implemented in the 2014-2020 programming period in the Mazowieckie region in Poland. The programme will primarily include schemes in the following sectors: road safety, culture heritage and health. The loan will be signed under the Programme Loan 2017-0081 POLAND REGIONAL INFRASTRUCTURE PROGRAMME.

    Ziele

    The operation will support road safety improvements, sustainable mobility, culture, health and public buildings, included in the investment programme of the Mazowieckie region. The programme will contribute to the implementation of the regional development strategy "Innovative Mazovia 2030" and will thus help to achieve the objectives of improving public space and transport system in the region, preserving the cultural heritage and creating a coherent healthcare system for the society. Some of the schemes are likely to be co-financed by the ESIF funds.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 300 million (EUR 71 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 600 million (EUR 142 million)

    Umweltaspekte

    The Bank will generally allocate its funds only to eligible schemes which are economically, technically and financially justified and environmentally sound. All schemes must comply with EU environmental, procurement and state aid legislation as well as with the principles of the Bank's Environmental and Social Standards. With the appropriate conditions in place the project is acceptable for financing in environmental and social terms.

    Auftragsvergabe

    The promoter is subject to the public procurement regime. The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/24/EU, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.

    Projektstatus

    Unterzeichnet - 15/12/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Gesundheit Stadtentwicklung Verkehr