Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20170081
    Veröffentlichungsdatum: 19 Juni 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    PUBLIC ENTITY(IES)

    Ort

    Beschreibung

    The operation will support eligible investment schemes in Polish regions. The programme supports regional development and infrastructure modernisation.

    Ziele

    The operation will support multi-sector investment programmes of Polish regions. Regions that potentially may benefit from this operation are categorised as less-developed, with the exception of the Mazowieckie voivodeship. Investment programmes of Polish regions are embedded in the context of comprehensive regional development and sectorial strategies, as well as regional and local integrated land-use planning. The schemes implemented under individual programmes are expected to increase connectivity and economic activity through better and safer road infrastructure for all road users, and through improved effectiveness of public services and cultural facilities for the benefit of all citizens in the regions.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 1100 million (EUR 257 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 3100 million (EUR 725 million)

    Umweltaspekte

    The project comprises a multi-scheme operation classified as a framework loan and some of the schemes may fall under Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU. Should any such scheme have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 2009/147/EC), the Bank would require the promoter to act according to the provisions of the aforementioned directives as transposed into national law. It is a requirement that all schemes must be implemented in compliance with EU environmental legislation. Environmental and efficiency improvements in public buildings will be required to comply with the provisions of the EU Directive on Energy Performance of Buildings 2010/31/EU.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU, as well as Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Genehmigt - 19/09/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Verkehr Kombinierte Infrastrukturvorhaben Gesundheit