    Referenz: 20160014
    Veröffentlichungsdatum: 6 April 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    MINISTRY OF INFRASTRUCTURE AND DEVELOPMENT / GDDKIA

    Ort

    Beschreibung

    Upgrading of about 40 km of the S7 express road between Koszwaly and Kazimierzowo in Northern Poland

    Ziele

    The project concerns the construction of a 40 km long 2 x 2 lane expressway with 12 metre median reserved for an additional lane, partially following the existing and partially along a new alignment in two northern voivodships of Poland - Pomeranian and Warminsko-Mazurskie. It is part of the S7 road linking Gdansk with Warsaw and further continuing south to Krakow and Slovakia. The project will facilitate the passage of long distance as well as regional traffic between Gdansk region and Warsaw and will improve traffic conditions on a heavily congested section between Gdansk and Elblag. The project includes 4 interchanges, more than 70 engineering structures, including 2 bridges over the Vistula river, as well as 26 animal passes. The project will complement the investments made so far on S7 road sections.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 240 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 680 million

    Umweltaspekte

    The project falls under Annex I of Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, requiring a full EIA procedure. The project crosses the Natura 2000 site Dolina Dolnej Wisly (PLB040003). Therefore, the provisions of the Habitats Directive (92/43/EEC, as amended) and Birds Directive (2009/147/EC) apply. The investments are included in the national road construction programme and the current operational programme infrastructure and environment, both of which were subject to a form of strategic environmental assessment. The procedures and outcomes of the environmental assessment are to be further reviewed during appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 19/11/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Verkehr