Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20150068
    Veröffentlichungsdatum: 14 Juli 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    RENFE OPERADORA

    Ort

    Beschreibung

    The proposed operation is a framework loan consisting of various investment schemes including rolling stock and infrastructure.

    Ziele

    The project aims to modernise, enhance the quality of service and provide additional capacity to Renfe Operadora, the Spanish state-owned railway operator.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 600 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1473 million

    Umweltaspekte

    The investment schemes included in the framework loan typically fall outside of the scope of the Environmental Impact Assessment (EIA) Directive. However, this will be further analysed during the appraisal, together with the potential impact (both positive and negative) of the investments. Compliance with the EIA directives, as well as any potential significant or negative impact of the project on areas included in the Natura 2000 network (according to the Habitats Directive 92/43/EEC and the Birds Directive 2009/147/EC), will be assessed during appraisal. All the investment schemes will support the competitiveness of rail – a sustainable mode of transport – which should lead to environmental benefits.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 1/10/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Spanien Verkehr