Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20150022
    Veröffentlichungsdatum: 10 April 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    MINISTRY OF FORESTRY AND WATER WORKS

    Ort

    Beschreibung

    Supporting forest rehabilitation, afforestation and erosion control activities in Turkey during the period of 2016-17 through the Ministry of Forestry and Water Works.

    Ziele

    The purpose of the operation is to maintain the Bank’s support to the Turkish Ministry of Forestry and Water Works’ nationwide programme of investments on afforestation, erosion control and forest rehabilitation during the period of 2016-2017.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 120 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 331 million

    Umweltaspekte

    Afforestation projects are included in Annex II of the Environmental Impact Assessment (EIA) Directive, but rarely do competent authorities require a full EIA in the case of afforestation/reforestation of existing forestry land. The project will focus on afforestation, erosion control and forest rehabilitation works. It is likely to deliver multiple environmental benefits particularly climate change mitigation and adaptation and improved natural resource management, contributing to both EU and Turkish environmental policy objectives. Technical features of the project and relevant EIA procedures will be analysed during appraisal.

    Auftragsvergabe

    Tendering and subcontracting procedures for site preparation, planting, maintenance and other works will be examined during the appraisal process. These are subject to Turkey’s public procurement legislation (PPL), which is modelled on the EC Public Procurement Directives and is in line with these directives in several key aspects. Turkey’s public procurement system has significantly improved since the adoption of the PPL in 2002 and is currently seen as of a high standard.

    Projektstatus

    Unterzeichnet - 28/12/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Türkei Landwirtschaft, Fischerei, Forstwirtschaft